•   Cost Estimation Methods in Infra Construction T300DI11-3002 30.08.2021-08.12.2021  5 cr  (19I351) +-
    Learning outcomes of the course unit
    The student is able to select an up-to-date quantity measurement instruction used in infrastructure construction and is able to read and apply it when making quantitative calculations. The student is able to make a cost estimate based on a completed quantity list when using any software in the field. The student is able to make a resource based cost estimate and can calculate a cost estimate for different work stages based on capacity and price data. The student knows the most important content of YSE. The student is able to explain the contract forms and their main differences. The student is able to list the types of risks involved in projects. After completing the course, the student will be prepared for cost accounting tasks related to the finance of a construction project in a construction and construction organization, as well as an understanding of how costs are incurred during the various stages of the project.
    Prerequisites and co-requisites
    Rakentamistalouden perusteet (TAL1), Maarakennustekniikka (GEO4) (not translated)
    Course contents
    Cost management at different stages of the project. Costing methods at different stages of a construction project. Infra building component and project nomenclatures and volume measurement instructions. Calculation of quantities and sizing of equipment. Costing. Preparation of quotation, unit prices and installment table. The contract formats. Risks (at conceptual level). Cost monitoring during production.
    Assessment criteria
    Satisfactory

    - Can read quantity measurement instructions used in infrastructure construction and calculate the number of work steps used in infrastructure construction.

    - Can make a cost estimate with the help of a completed quantity list and the given unit prices.

    - Knows how to calculate cost estimates on a resource basis.

    - Can list the main forms of contract and some risks related to infrastructure construction.

    Good

    - Is able to calculate the number of key steps used in infrastructure construction using the quantity measurement procedure used in infrastructure construction.

    - Can make a cost estimate with a completed quantity list and given unit prices, and can categorize non-site costs at unit prices.

    - Is able to calculate cost estimates based on resource-based input data and capacities for key infrastructure work phases.

    - Can determine what are the pros and cons of different types of contract in different cases.

    - Can identify the main risks of a simple infrastructure construction project.

    Excellent

    - Ed. in addition, the student has a comprehensive understanding of the course topics and their use in problem solving as well as the ability to present, analyze and reason logically solutions.


    Name of lecturer(s)

    Hannu Kauranen

    Recommended or required reading

    Tunneilla nimetty aineisto.
    Lindholm Mika, Kustannushallinta rakennushankkeessa.
    INFRAn Rakennusosa- ja hankenimikkeistö 2015 Määrämittausohje soveltuvine osineen. (not translated)

    Planned learning activities and teaching methods

    lähi/ ja etäopetus
    opetuskeskustelu
    harjoitukset
    harjoitustyöt
    tentti (not translated)

    Assessment methods and criteria

    Opintojakso arvioidaan asteikolla 0-5. Arvosana arvioidaan annetussa aikataulussa palautettujen harjoitustöiden perusteella. Mikäli on haluja korottaa harjoitustöiden perusteella saatavaa arvosanaa, onnistuu se aivan kurssin lopussa olevalla vapaaehtoisella kokeella. Opintojakson suorittamisessa edellytetään säännöllistä osallistumista (minimisuositus 70 %) harjoitus- ja oppitunneille. (not translated)

    Language of instruction

    Finnish

    Timing

    30.08.2021 - 08.12.2021

    Registration

    01.08.2021 - 20.09.2021

    Credits

    5 cr

    Group(s)

    19I351

    Teacher(s)

    Anne Kasari

    Further information for students

    anne.kasari@tuni.fi (not translated)

    Unit, in charge

    Construction Engineering

    Degree programme(s)

    Degree Programme in Construction Engineering

    Office

    TAMK Main Campus

    Evaluation scale

    0-5

    Completion alternatives

    ei ole (not translated)

    Training and labour cooperation

    vierailevia luennoitsijoita (not translated)

    Exam schedule

    1 tentti opintojakson aikana, uusinta- ja korotustentit sovitaan myöhemmin (not translated)

    International connections

    - (not translated)

    Students use of time and load

    Lähi- ja/tai etäopetus yhteensä noin 50 h. Näillä tunneilla paitsi käydään teoriaa läpi, tehdään myös pakollisia harjoitustöitä (3 kpl) eteenpäin. Harjoitustöitä jatketaan omalla ajalla.
    Lisäksi normaali itsenäinen työskentely. (not translated)

    Content periodicity

    1. Johdanto, kustannushallinta projektin eri vaiheissa
    2. Infran rakennusosa- ja hankenimikkeistöt sekä määrämittaus
    3. Kustannuslaskennan menetelmät rakennushankkeen eri vaiheissa
    4. Määrien laskeminen ja kaluston mitoittaminen
    5. Kustannusarvion laatiminen
    6. Tarjouksen, yksikköhintojen ja maksuerätaulukon laatiminen
    7. Kustannusseuranta (not translated)