The designing assignment is handed over completely but there are such a mistakes in the documents, that would lead into insufficient content of purchases or systems that are not working correctly. The progression of the project process has been insufficient.
All documents handed over are well done and according to the assignment. Documents are sufficient for purchasing building services systems and systems are designed correctly. Project has progressed smoothly in the schedule.
Student is able to demonstrate the purchases required for the systems and correctly working systems in the documents handed over. Systems designed by the student have features that points out Student’s personal talents. Student is able to deal Building services systems as a solid wholeness. The progression of the process has been smooth, organized and in the schedule.
Jussi-Pekka Juvela
Finnish
10.01.2022 - 31.05.2022
01.12.2021 - 17.01.2022
5 cr
19AI252
Joel Tirkkonen, Jussi-Pekka Juvela
Building Services Engineering
Degree Programme in Building Services Engineering
TAMK Main Campus
0-5